The principles

A program is a claim that a path is safe and removes the right material. Prove it in stages, each one cheaper than a crash:

  1. Simulate the stock being cut, and compare the result with the model.
  2. Dry run at the machine with the spindle off and the tool well above the part (for example with Z offset raised), watching the whole path for anything unexpected.
  3. Single block the first cuts: one line at a time, with feed and rapid overrides turned down, a hand on the stop, watching distance to go.
  4. First article. Cut one part, measure it, and only then run the batch.

Software checks the model, stock, tool and machine facts it was given. It cannot see a clamp you forgot to enter or a wrong tool length.

What CamCraft does

  • Simulate plays the program against the stock. Deviate colours where material is left or where the program cut into the part, and Frame rest and Frame gouge go to the worst spot of each. Paths shows the cached toolpaths together.
  • Verify runs at Post. It writes the program only when every operation is generated and current, none carries a warning, and the whole program passes: no gouge into the part, no move strikes a fixture, no rapid runs through stock, and no move exceeds a limit the mounted machine states. See Posting.
  • What a refusal means. The message names the operation and the problem. A gouge refusal means the simulated cutter removed model material; a warning refusal names the flagged moves, which are marked in the viewport. The table of common messages is in Reading a refusal and Troubleshooting.
  • Why refuse rather than warn. A warning on a dialog gets clicked through and the program is posted anyway. Where the output could drive the tool into the part or a fixture, CamCraft writes nothing, and leaves any existing file untouched. The two named exceptions are advisory and show on the operation without holding the post: a scallop note (a finish quality matter) and a probe search distance.
  • "Not judged" is not "fine". If a check cannot run to completion, for example a hidden-material scan that hits its budget, that is reported as not judged and holds the post, never counted as zero.
  • Setup sheets list each setup's tools in change order, with estimated time, for the operator.

A green gate is not a guarantee. Run the dry run, single block and first-article steps above on any new program.